For these three residences, Climalcor has been responsible for carrying out the air conditioning, ventilation, and DHW installations with thermal solar connectors and integrated accumulator from the Solcrafte manufacturer.
Regarding the boilers installed in the three residences, units from the Cointra manufacturer were used.
As for the air conditioning, we have opted to use ducted air conditioners from the Carrier manufacturer. These air conditioners are energy class A+++.
These are the photos of the final result.
- obra de rehabilitacion 9152
- obra de rehabilitacion 9153
- obra de rehabilitacion 9154
- obra de rehabilitacion 9155
- obra de rehabilitacion 9158
- obra de rehabilitacion 9161
- obra de rehabilitacion 9162
- obra de rehabilitacion 9163
- obra de tres viviendas 9461
- obra de tres viviendas 9462 rotated 1
- obra de tres viviendas 9463 rotated 1
- obra de tres viviendas 9465 rotated 1
- obra de tres viviendas 9466
- obra de tres viviendas 9467
- obra de tres viviendas 9468 rotated 1
- obra de tres viviendas 9469 rotated 1
- obra de tres viviendas 9470
- obra de tres viviendas 9471
- obra de tres viviendas 9473
- obra de tres viviendas 9475
- obra de tres viviendas 9476 rotated 1
- obra de tres viviendas 9477 rotated 1
- obra de tres viviendas 9478 rotated 1
- obra de tres viviendas 9479 rotated 1
- obra de tres viviendas 9480
- obra de tres viviendas 9481
- obra de tres viviendas 9483
- obra de tres viviendas 9484
- obra de tres viviendas 9485
- obra de rehabilitacion 9149
- obra de rehabilitacion 9150
- obra de rehabilitacion 9151